SECURITY AND COORDINATION PLAN
The project includes civil and electrical works regarding the installation of a synchronous compensator (ICS) inside the Electric Station 380/150 kV Foggia (FG).
The realization of the entire work was divided into two phases:
PHASE 1: realization of the works preparatory to the ICS consisting in the realization of AT foundations unified Terna.
PHASE 2: realization of the Synchronous Compensator Plant (ICS) consisting in the realization of the civil works necessary for the installation of ICS equipment; Installation of ICS machinery, installation of a series of prefabricated buildings intended for the shelter of the premises SC and SA with electrical enclosures for the protection, command and control of the plant, the installations constituting the general and auxiliary services of the ICS and the control room;